The concrete guys have finished the backfill for the winery foundation and laid rebar ready for the final pad to be poured. They also laid the trench drain in place for drainage from the winery floor. Before backfilling we also laid down a conduit for the electrical line running from the building underground to the pumphouse and house.
I also setup the BBQ and we have a firepit/barbeque entertaining area ready for visitors now. Bring Meat!
Darby and Scruffy have been busy supervising the foundation work along with performing pest control duties. We get a large heard of deer in the neighbour's field behind our house each night around 7:30pm that stick around for a few hours. Scruffy and Darby sent them off the other night and chased them all the way back down the property line. We have not seen the deer behind the house since.